How Long Does a Roof Replacement Take?

Most shingle roofs are replaced in one to three days. Heavier and specialty materials take much longer.

MaterialTypical time on site
Asphalt shingles1–3 days (Angi); often 1–2 days on an average home (GAF)
Metal4 days or more (eLocal)
Slate2–4 weeks (eLocal)

What happens on a typical shingle job

  1. Morning of day 1: the crew protects your yard and siding, then strips the old roof. On a standard home this takes a few hours.
  2. Day 1, after tear-off: any rotten decking is replaced, then underlayment, ice-and-water shield and drip edge go on.
  3. Day 1–2: shingles, flashing, vents and ridge cap are installed.
  4. Last day: cleanup with magnetic sweepers for nails, and a final walk-through.

What can slow it down

How to prepare

More roof cost guides

Frequently asked questions

Can a roof be replaced in one day?

Yes. Many asphalt shingle roofs on average-sized homes are torn off and replaced in a single day by a full crew.

Do I need to be home during a roof replacement?

Not usually, but be reachable in case the crew finds decking damage and needs your approval for extra work.

How long does a metal roof take to install?

Usually four days or more, depending on the panel type, roof size and complexity.